Size
3500m2
This third phase of the unique Mount Wise development in Plymouth introduces a new era of waterside living to this stunning redevelopment of the former military headquarters.
Leeward House blends urban living with the waterside in a collection of contemporary 1, 2 and 3 bedroom apartments and penthouses creatively arranged over six floors. Working with the Mechanical Contractor UFHN delivered every floor of apartments on time incorporating low- temperature towelrails in the bathrooms run through the UFH manifolds and control system.
UFHN worked closely with the Contractor every step of the way, providing a seamless install.
M&E Contractor
3500m2
Installed Mercury UFH system. 16mm MLCP pipe clipped to insulation.
Touch screen controller with dial thermostats