Chewton Glen

Hampshire

Chewton Glen

Hampshire

The 5 Star Chewton Glen Country House hotel in Hampshire wanted to build new accommodation in its grounds, at the edge of the New Forest National Park in time for the opening of the 2012 London Olympics.

This presented an interesting challenge for heating and hot water provision as the 12 luxury suites are sited in six tree houses, each with a family sized whirlpool bath, power shower and of course underfloor heating.

With the deadline for the Olympics fast approaching, Chewton Glen turned to UFHN and Renewable Energy System installer PowerNaturally Ltd to jointly design and deliver a cost-effective and efficient solution.

12 luxury suites sited in six stunning tree houses on the edge of the New Forest.

Client

Chewton Glen Hotel

Size

800m2

Product

Fully designed system with 20mm Mercury pipe

Controls

Programmable thermostats

Sign up to our Newsletter

Marketing Permissions